MD.250.9.4, FNM – FY 2009 Financial Audit Review Program Certification in
ROOT
Maryland Bulletin: 250-9-4
Subject: FNM – FY 2009 Financial Audit Review Program Certification in ROOT
Date: January 7, 2009
Purpose. To instruct field offices on the process to Certify
FY 2009 MG documents in the ROOT.
Expiration Date. September 30, 2009
Action Required No Later Than: January 22, 2009
Explanation.
Field offices are currently reviewing FY 2009 ProTracts (MG) open obligations
and answering questions related to each contract identified in the Review of
Open Obligations Tool (ROOT). The review process is completed after a Program
Concurrence certifies that all questions have been answered correctly and all
actions needed to validate the open obligation have been completed. Any actions
not completed will be noted in check box #5 on the Open Obligation
Determination. Reasons will be documented in the comment box and must be
associated with actions required by either statute or policy.
State Office staff will conduct Quality Assurance Reviews (QAR) in each field
office. The QAR will concur that the questions in the ROOT are answered
correctly and documentation exists. The QAR will review a minimum of 10% of the
contracts.
Field offices will need to have the following actions completed on or before
January 22, 2009:
Checklist
- Checklist Complete: All FY2009 MG Documents will have the checklist
complete and marked in Checklist tab in the ROOT.
- All Required Actions Except as Noted…: This will be checked after all
actions identified in the checklist are completed. Any actions not completed
by January 22 will be noted in the comments on the Open Obligation
Determination page.
Open Obligation Determination
- Obligation is valid as of September 30, 2008. Do NOT check this box for
FY2009 obligations.
- Deobligation Recommended.
- Deobligation Complete: This date will be entered when action has been
taken to deobligate the funds.
- Obligation is valid as of review date. Check this box if the obligation
is valid as of the review date. Enter a “0” in the text box unless a portion
of these funds are to be considered as FY2008 funds. The CSP contracts
should not have any FY08 funds in the document since these are obligated and
paid out annually.
- Required actions cannot be completed by December 30, 2008 as noted in
the Review Comments due to policy or statutory provisions. Do NOT check this
box, even if actions are needed. This Box is not relevant to FY09
obligations.
Comments will be entered on this page only when actions needed are not be
completed by January 22. Comments need to be brief and to the point of what
action is need. There will also be a date when this action is to be completed.
Examples include:
- MFR needed for POA no later than 2.10.09.
- Control of land needed no later than 1.31.09.
- Cancelation letter needed non later than 2.2.09
When the action is completed an entry will be made in the comment box
indicating this.
Certification of Obligation
Program Concurrence: All obligation review documents must be certified under
a Program Concurrence. This will be the final review certifying that all actions
are completed or explained as needed. Program concurrence will be done only
after all actions are completed and documented in the file or box 5 has been
checked and properly documented. Someone other than the person completing the
Checklist and Obligation Determination must be the Program reviewer. The Program
reviewer will verify all actions are completed before certification can be
applied. This will need to be completed no later than January 22, 2009
/s/
JON F. HALL
State Conservationist
Attachment: see email dated 01/07/2009
DIST: AE
< Back to 2009 Bulletins
|